FAQ
Questions, answered properly
Grouped roughly by when they come up. If yours is not here, just ask.
Quoting and booking
- How far ahead should I book?
- As early as you can. Month-end and Friday dates go first everywhere in London, and if your building requires a booked lift slot you are competing with every other resident for the same windows.
- Do you charge for a survey?
- No. It is how we establish what the building will and will not allow, which is the whole basis of an accurate quote.
- Why will you not quote over the phone?
- Because the number would be wrong. Access in London varies more than contents do, and a quote that ignores the access gets corrected on the morning when you have no alternative.
- What if my completion date moves?
- Tell us as soon as you know. Chain delays are normal and we will do what we can to hold the crew. If your building has a booked lift slot, that may need rebooking too, which is another reason to tell us early.
Buildings and access
- My block has a service lift. Does that make it easy?
- It helps a great deal, but it has to be booked, it usually has to be protected with blankets first, and there are normally restricted hours. Easy physically, administratively involved.
- What does the managing agent need from you?
- Typically written notice of the date, and increasingly evidence of public liability insurance before a crew is admitted. Some buildings also want the communal condition recorded beforehand. All of it is routine and all of it takes time.
- Can a removal lorry get into my underground car park?
- Usually not. Height restrictions in London car parks are commonly below what a removal vehicle needs, so the load runs from a surface bay and the carry is longer than the building suggests. We check the clearance rather than assume it.
- My street is a red route.
- Then there is no stopping during controlled hours at all, and kerbside loading is not available. We work from a side street with a carry, or start outside the controlled period. It is planned rather than discovered.
- Do you protect communal areas?
- Always. In a converted house the shared hallway belongs to several leaseholders, and damage becomes a bill split between people who did not move. Runners and corner guards go down before anything else happens.
Period and listed property
- What does listing mean for my move?
- It means the protected fabric — original joinery, staircases, balusters, doors, cornices, shutters — cannot be altered or removed without consent, inside as well as out. In practice we protect it and we work around it. We do not modify it.
- Something will not fit. What are my options?
- Sell it, store it, have it professionally dismantled if it was designed to come apart, or in rare cases bring in a specialist hoist with the appropriate consents. We tell you at the survey so all four are still open.
- Is stucco really that fragile?
- It chips easily and it is slow and costly to repair properly, which is why reveals, thresholds, railings and front steps get protected before the first item moves.
- How much is in a London cellar?
- More than the owner thinks, almost universally. It is the commonest reason a vehicle turns out too small, so we count it properly at the survey.
Next step
Still got a question?
Ask it. We would rather answer something now than have it become a problem on the day.